We successfully delivered a sensitive, multi-phase development at this Grade II listed building, fully complying with heritage and planning requirements.
Phase 1: Undertook shell & core works, such as structural alterations, a basement extension, a second-floor rear extension, building envelope upgrades, and core MEP installation. All works were carried out with meticulous care to preserve the building’s historic fabric.
Phase 2: Refurbished three residential flats, including internal reconfiguration, installation of new services, premium finishes, and regulatory upgrades. This phase harmoniously blended modern standards with the property’s original character.
Phase 3 : Upcoming works include the Fit-out of office space and a cultural centre, along with refurbishment of the alleyway, continuing the careful balance between contemporary functionality and heritage preservation.